Every stop, with its reason.
Plan open-circuit, trimix and rebreather dives on Bühlmann or Thalmann, and see the ceilings, gas switches and oxygen exposure behind every stop.
- Runtime
- 80min
- TTS
- 57min
- First stop
- 27m
- CNS
- 44%
- OTU
- 106
Advisories · 1
Real DiveLogic plans. Pick a dive and the gradient factors.
Two families of model, side by side.
Bühlmann ZHL-16C with your gradient factors, or Thalmann's exponential-linear model in seven parameter sets. Run any plan on both and read the difference.
| Plan | Runtime | First stop | CNS | Time to surface |
|---|---|---|---|---|
| Bühlmann ZHL-16C, GF 30/70 | 67min | 24m | 34% | 39min |
| Bühlmann ZHL-16C, GF 50/70 | 64min | 18m | 34% | 37min |
| Thalmann E-L, XVal-He 2.3% | 44min | 12m | 20% | 17min |
Each dive with EAN50 and EAN80 for decompression, in salt water, with a 6 m last stop.
The schedule you carry.
Stop by stop: depth, time, runtime, gas and ppO₂. Tissues, ceilings and gas density are one step away when you want them.
| Phase | Depthmetres | Timeminutes | Runtimeminutes | Gas | ppO₂bar |
|---|---|---|---|---|---|
Surface | Surface | - | 0 | OC 21/35 | - |
Descent | 45 | 3 | 3 | OC 21/35 | 1.11 |
Level | 45 | 25 | 28 | OC 21/35 | 1.16 |
Ascent | 24 | 3 | 30 | OC 21/35 | 0.75 |
Stop | 24 | 1 | 31 | OC 21/35 | 0.72 |
Ascent | 18 | 2 | 33 | OC 50% | 1.49 |
Stop | 18 | 1 | 34 | OC 50% | 1.41 |
Ascent | 12 | 2 | 36 | OC 50% | 1.19 |
Stop | 12 | 2 | 38 | OC 50% | 1.11 |
Ascent | 9 | 1 | 39 | OC 50% | 1.03 |
Stop | 9 | 4 | 43 | OC 80% | 1.53 |
Ascent | 6 | 1 | 44 | OC 80% | 1.41 |
Stop | 6 | 17 | 61 | OC 80% | 1.29 |
Ascent | 0 | 6 | 67 | OC 80% | 1.05 |
The app's schedule table: 45 m on 21/35 at GF 30/70.
Checked before the water checks you.
ppO₂, CNS and OTU, gas density, helium switches and ascent rates on every plan. When two limits disagree, the cautious one wins.
Must fix · 3
Advisories · 1
The dive you hope not to do, planned too.
Contingencies are planned the same way as the dive, before you get wet.
- Lost gas
- A full re-plan for every deco or stage cylinder you could lose.
- Bailout
- Every bailout set on a rebreather, from the worst moment.
- O₂ breaks
- Air breaks, or a lowered setpoint on the loop.
After the dive, the plan is checked.
The dive you recorded comes back laid over the plan you made, scored on depth, descent, ascent rate and stops. The next plan starts from what that one taught you.
76/ 100Adherence
- Depth deviation
- 1.5 m
- Runtime vs plan
- -5.1 min
- Descent vs plan
- +0.8 min
- Peak ascent
- 11 m/min
- Ascent was fast in placesYour ascent peaked near 11 m/min. Keeping ascents to ~9-10 m/min gives tissues time to off-gas.
- Surfaced earlier than the planThe dive was 5 min shorter than planned: check that no decompression was cut.
- 6 m stop was shortPlanned 17 min at 6 m, but about 14 min was recorded there.
| Stop | Planned | Held |
|---|---|---|
| 24 m | 1 min | 1.75 min |
| 18 m | 1 min | 1.75 min |
| 12 m | 2 min | 3 min |
| 9 m | 4 min | 5 min |
| 6 m | 17 min | 14 min · short |
A few factors added decompression stress on this dive. The notes below are where the margin is.
Example review. For education and reflection, not a diagnosis.